3 Maintenance
3.1.1. Introduction
73
3HAC030005-001 Revision: -
©
Copyri
ght 200
6 ABB
.
All ri
ghts res
erved.
3 Maintenance
3.1 Overview
3.1.1. Introduction
Structure of this chapter
This chapter details all maintenance activities recommended for the robot and any external
units of the robot.
It is based on the maintenance schedule, located in the beginning of the chapter. The schedule
contains information about required maintenance activities including intervals and refers to
procedures for the activities.
Each procedure contains all information required to perform the activity, that is, required
tools and materials.
The procedures are gathered in different sections and divided according to the maintenance
activity.
Safety information
Before any service work is commenced, it is extremely important that all safety information
is observed!
There are general safety aspects that must be read through, as well as more specific safety
information that describe danger and safety risks when performing the procedures. Read the
chapter
Safety
before performing any service work.
Summary of Contents for IRB 360/3
Page 1: ...Product manual Parallel robot IRB 360 IRB 360 3 IRB 360 1 800 M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 246: ...Index 232 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 247: ......