Required equipment and references
Note
Spare part No.
Equipment
Standard tools
See
Product manual, spare
parts - IRB 360
.
Upper arm
See
Product manual, spare
parts - IRB 360
.
Sealing ring
See
Product manual, spare
parts - IRB 360
.
Flange gasket ax.1-3
See
Product manual, spare
parts - IRB 360
.
VK-cover
Loctite 243
Locking liquid
References
Replacement of parallel arms on page 174
Mounting instructions for seals on page 160
CAUTION
Always cut the paint with a knife and grind the paint edge when disassembling
parts. See
Cut the paint or surface on the robot before replacing parts on page 165
.
Removal
Note
Action
Described in section
Replacement of parallel arms on
Remove the parallel arm
on the specific upper arm.
1
Use a screwdriver.
Remove the VK-cover
2
6x Hex socket head cap screw M6 x 40 (12.9 gleitmo) and
6x plain washer 6.4x12x1.6 Steel A2-F
Remove the six screws
3
Remove the upper arm.
4
Note
Always check the condi-
tion of the sealing ring
and the flange gasket
5
Continues on next page
Product manual - IRB 360
181
3HAC030005-001 Revision: U
© Copyright 2008-2018 ABB. All rights reserved.
4 Repair
4.3.4 Replacement of upper arm
Continued
Summary of Contents for IRB 360 Series
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 156: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 258: ...This page is intentionally left blank ...
Page 276: ...This page is intentionally left blank ...
Page 278: ...This page is intentionally left blank ...
Page 283: ......