4.3.12 Replacement of motor axis 1-3
General
This section describes replacement of motor axis 1-3.
DANGER
Turn off all electrical power, hydraulic and pneumatic pressure supplies before
entering the workspace of the manipulator.
Also read the safety sections:
•
Safety risks related to pneumatic/hydraulic systems on page 33
•
Risks associated with live electric parts on page 29
•
Safety risks during installation and service work on robots on page 23
Note
This action demands standard calibration of the robot. Described in section
Calibration method on page 238
.
Continues on next page
Product manual - IRB 360
205
3HAC030005-001 Revision: U
© Copyright 2008-2018 ABB. All rights reserved.
4 Repair
4.3.12 Replacement of motor axis 1-3
Summary of Contents for IRB 360 Series
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 156: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 258: ...This page is intentionally left blank ...
Page 276: ...This page is intentionally left blank ...
Page 278: ...This page is intentionally left blank ...
Page 283: ......