3 Maintenance
3.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRB
360.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
Note
If the IRB 360 is connected to power, always make sure that the IRB 360 is
connected to protective earth and a residual current device (RCD) before starting
any maintenance work.
For more information see:
•
Product manual - OmniCore C30
•
Product manual - IRC5
•
Product manual - IRC5 Compact
•
Product manual - IRC5 Panel Mounted Controller
•
Robot cabling and connection points on page 86
Product manual - IRB 360
89
3HAC030005-001 Revision: Z
© Copyright 2008-2021 ABB. All rights reserved.
3 Maintenance
3.1 Introduction
Summary of Contents for IRB 360
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 266: ...This page is intentionally left blank ...
Page 268: ...This page is intentionally left blank ...
Page 271: ......