3.3.5 Test run after installation, maintenance, or repair
Safe handling
Use the following procedure after installation, maintenance, or repair, before
initiating motion.
DANGER
Initiating motion without fulfilling the following aspects, may increase the risk for
injury or cause damage to the robot.
Action
Remove all tools and foreign objects from the robot and its working area.
1
Verify that the robot is properly secured to its position by all screws, before it is powered
up.
2
Verify that any safety equipment installed to secure the position or restrict the robot
motion during service activity is removed.
3
Verify that the fixture and work piece are well secured, if applicable.
4
Verify that all safety equipment is installed, as designed for the application.
5
Verify that no personnel are inside the safeguarded space.
6
If maintenance or repair has been done, verify the function of the part that was main-
tained.
7
Verify the application in the operating mode manual reduced speed.
8
Collision risks
CAUTION
When programming the movements of the robot, always identify potential collision
risks before initiating motion.
Product manual - IRB 365
57
3HAC079185-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
3 Installation and commissioning
3.3.5 Test run after installation, maintenance, or repair
Summary of Contents for IRB 365
Page 1: ...ROBOTICS Product manual IRB 365 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 198: ...This page is intentionally left blank ...
Page 216: ...This page is intentionally left blank ...
Page 232: ...This page is intentionally left blank ...
Page 234: ...This page is intentionally left blank ...
Page 238: ......
Page 239: ......