Removing complete tubular shaft unit
Use this procedure to remove the complete tubular shaft unit.
Note
Action
How to drain the oil from the gearbox is
described in section:
•
Changing the oil, axis-4 gearbox
on page 172
Drain
oil
from gearbox axis 4.
1
xx0800000336
Move the robot to the position shown in the
figure.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
3
xx0800000335
Remove the
bracket
securing the cable
package to the tubular shaft unit by remov-
ing its attachment screws.
4
Parts:
•
A: Tubular shaft unit
•
B: Attachment screws M6x16 qual-
ity 8.8-A2F (2 pcs)
•
C: Bracket
Place the cable package in a way that it will
not be damaged in the continued removal
procedure.
5
How to remove motors is described in
section:
•
Remove motors axes 4, 5 and 6.
6
Continues on next page
252
3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.4.2 Replacing complete tubular shaft unit
Continued
Summary of Contents for IRB 4600 - 40/2.55
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......