4.3.2 Refitting the complete cable harness
Introduction
This procedure describes how to refit the complete cable harness.
How to remove the cable harness is described in
.
The refitting procedure is presented in the order the work is recommended to be
performed.
Therefore the order is different in the two procedures removal and refitting of the
cable harness. Cross references will make it easy to find what is needed to know
as the work continues.
The section
Refitting the complete cable harness
consists of the following parts
presented in the order the work is recommended to be performed:
•
Refitting in the frame
Refitting the cable harness in the frame on page 210
•
Refitting in the base
Refitting the cable harness in the base on page 213
•
Refitting in the lower arm and armhouse
Refitting the cable harness in the
lower arm and armhouse on page 219
.
How to refit the SMB unit, brake release unit and motors can be found in:
•
SMB unit
Refitting the SMB unit on page 226
•
Brake release unit
Refitting the brake release unit on page 230
•
Motors
Continues on next page
3HAC033453-001 Revision: H
207
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.3.2 Refitting the complete cable harness
Summary of Contents for IRB 4600 - 40/2.55
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......