Note
Action
xx0900000017
Sort out the different cables the way they
later will be fit on the bracket in the base.
11
Connections:
•
A: Earth cables
•
B: R1.SMB1-2
•
C: R1.SMB3-6
•
D: R2.SMB
•
E: R1.CP/CS
•
F: R1.MP
•
G: Air hose
•
H: Position of R1.CBUS (if used)
•
J: R1.SMB
How to refit the cable harness in the base
is described in section:
•
Refitting the cable harness in the
base on page 213
Continue the refitting of the cable harness
in the base.
12
Refitting the cable harness in the base
Use this procedure to refit the cable harness in the base.
Tip
Before starting this procedure, first refit the cable harness in the
frame
. See:
•
Refitting the complete cable harness on page 207
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
1
Continues on next page
3HAC033453-001 Revision: H
213
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.3.2 Refitting the complete cable harness
Continued
Summary of Contents for IRB 4600 - 40/2.55
Page 1: ...ABB Robotics Product manual IRB 4600 ...
Page 108: ...This page is intentionally left blank ...
Page 318: ...This page is intentionally left blank ...
Page 332: ...This page is intentionally left blank ...
Page 373: ......