3 Maintenance
3.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRB
4600 Foundry Prime.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
Note
If the IRB 4600 Foundry Prime is connected to power, always make sure that the
IRB 4600 Foundry Prime is connected to protective earth before starting any
maintenance work.
For more information see:
•
Product manual - IRC5
Product manual - IRB 4600 Foundry Prime
107
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
3 Maintenance
3.1 Introduction
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......