Note
Action
A
B
C
xx1200000857
A R1.CP/CS
B R1.MP
C Air hose
Before refitting the connectors on the
bracket, arrange cables and connectors as
shown in the figure.
9
xx0900000017
Refit the
connectors
and
air hose
on the
bracket:
•
R1.CP/CS
•
R1.ETHERNET (if used)
•
R1.MP
Tip
Do not refit the
R1.SMB-connector
and
air
hose
at this stage. It will be easier to refit
these two when the bracket has been fitted
to the distance screws.
10
Connectors:
•
A: Earth cables
•
B: R1.SMB1-2
•
C: R1.SMB3-6
•
D: R2.SMB
•
E: R1.CP/CS
•
F: R1.MP
•
G: Air hose
•
H: Position of R1.ETHERNET (if
used)
•
J: R1.SMB
Continues on next page
Product manual - IRB 4600 Foundry Prime
227
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.2 Refitting the complete cable harness
Continued
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......