Note
Action
xx1700000993
Disconnect the battery cable by pressing
down the upper lip of the R1.G connector
to release the lock while pulling the connect-
or upwards.
11
See the figure in:
•
Location of SMB unit on page 245
Disconnect the remaining connectors on
the SMB unit:
•
R1.SMB1-2
•
R1.SMB3-6
•
R2.SMB
12
Refitting the SMB unit
Use this procedure to refit the SMB unit.
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
to the robot, before entering the robot
working area.
1
Clean the joints that have been opened. See
Cut the paint or surface on the robot before
replacing parts on page 201
2
xx1700000994
Reconnect contacts on the SMB unit:
•
R1.SMB1-2
•
R1.SMB3-6
•
R2.SMB
•
Battery cable R1.G (X3) Make sure
the lock snaps into place during refit-
ting.
3
See the figure in:
•
Location of SMB unit on page 245
Place the SMB unit on its
attachment
screws
.
4
Secure the SMB unit with its attachment
screws.
5
Continues on next page
Product manual - IRB 4600 Foundry Prime
249
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.4 Replacing SMB unit
Continued
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......