2.4.7 Surface inspection before start-up - Foundry Prime
Foundry Prime coating
Make sure that the special Foundry Prime painting of the robot arm surfaces is not
broken or there have been any other damages during testing and installation.
Even a small collision during installation can destroy the preventive coating and
the corrosion barrier is broken. Use the Touch up kit available for Foundry Prime,
3HAC035355-001, to repair damages to paint surfaces.
Pre-installation procedure/ Operation conditions, robot
Value
Parameter
+5°C
Minimum ambient temperature
+45°C
Maximum ambient temperature
100% at constant temper-
ature (gaseous only)
Maximum ambient humidity
Protect attachment bolts and washers at the base
Protect the attachment bolts and washers (M24x100) at the base from physical
obstructions and splashes with appropriate shield.
82
Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
2 Installation and commissioning
2.4.7 Surface inspection before start-up - Foundry Prime
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......