Note
Action
xx1300000668
Tip
Use tape and tie the axis-5 and axis-6
connectors and carrier into a bundle (if not
already done). This is done to facilitate the
procedure and to avoid damaging the parts
during the procedure.
This will also make it easier to run the cable
harness through the inside of the robot.
2
Person 1, working at the side hole:
xx2000000416
Run the cable harness through the cable
guide and then into and through the upper
arm tube.
Tip
This step is best performed by two persons
working together:
•
Person 1: Put one hand inside the
side hole of the arm tube and take
a hold of the cable harness.
•
Person 2: Take a hold on the cable
harness at the back of the robot.
•
Together: Use caution and move the
cable harness into the arm tube.
3
Person 2, working at the back:
xx1700001569
Continues on next page
228
Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the arm house cover including the axis-4 cassette sealing
Continued
Summary of Contents for IRB 5710
Page 1: ...ROBOTICS Product manual IRB 5720 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 580: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 609: ......