3 Maintenance
3.3.8. Inspection, cable harness
161
3HAC023082-001 Revision: E
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Inspection, cable harness, axes 5-6
The procedure below details how to inspect the cable harness of axes 5-6.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the
air pressure to motors and SMB.
2. Make an overall visual inspection of the cable
harness, in order to detect wear and damage.
3. Check the
attachments at the rear of the
upper arm and in the upper arm tube.
Check the
connectors at the cable harness
division.
Make sure the attachment plate is
not bent or in other way damaged.
Shown in the figure
.
4.
note
If the manipulator is used in a Foundry Prime
application, check the
cables
for cracks in
insulation.
Shown in the figure
5. Replace the cable harness if wear, cracks or
damage is detected.
Detailed in section:
•
Replacement of cable harness,
axes 5-6 on page 249
•
Replacement of cable harness,
axes 5-6, IRB 6600ID and IRB
6650ID on page 253
Continued
Summary of Contents for IRB 6600 - 175/2.8 type B
Page 2: ......
Page 10: ...Table of Contents 8 3HAC023082 001 Revision E Copyright 2004 2008 ABB All rights reserved ...
Page 532: ......