3 Maintenance
3.3.11. Inspection, additional mechanical stops
3HAC023082-001 Revision: E
168
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Inspection, mechanical stops
The procedure below details how to inspect the additional mechanical stops on axes 1,2 and 3.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
2. Check the
additional stops
on axes 1, 2 and 3for
damage.
Shown in the figure
!
3. Make sure the stops are properly attached.
Correct tightening torque, mechanical stop axis 1:
120 Nm.
4. If any damage is detected, the
mechanical stops
must be replaced!
Correct attachment screws (lubricated with Molycote
1000):
•
Axis 1: M16 x 35
•
Axis 2: M16 x 50
•
Axis 3: M16 x 60
Art. no. is specified in
!
Continued
Summary of Contents for IRB 6600 - 175/2.8 type B
Page 2: ......
Page 10: ...Table of Contents 8 3HAC023082 001 Revision E Copyright 2004 2008 ABB All rights reserved ...
Page 532: ......