4 Repair
4.3.2. Replacement of cable harness, axes 1-4
3HAC023082-001 Revision: E
244
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Refitting, cable harness, axes 1-4
The procedure below details how to refit the cable harness, axes 1-4.
11. Remove the cable gland securing the cables inside
the lower arm.
12. Remove the cable gland securing the cables to the
arm house.
xx0100000143.wmf
13. Remove the
velcro strap
from the harness at the
cable fixing bracket at the arm house.
.
14. Disconnect
connector R2.M5/6
at the cable division
point.
!
15. Disconnect all connectors at motor 3 and motor 4.
Specified and shown in the figure
Location of cable harness on
page 240
16. Gently pull the cable harness out.
Action
Note/Illustration
Action
Note/Illustration
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
2. In order to facilitate refitting of cable harness,
move the robot to the specified position:
•
Axis 1: 0 degrees
•
Axis 2: 0 degrees
•
Axis 3: 0 degrees
•
Axis 4: 0 degrees
•
Axis 5: +90 degrees
•
Axis 6: no significance
Axes 2 and 3 may be tilted slightly to
improve access.
Continued
Continues on next page
Summary of Contents for IRB 6600 - 175/2.8 type B
Page 2: ......
Page 10: ...Table of Contents 8 3HAC023082 001 Revision E Copyright 2004 2008 ABB All rights reserved ...
Page 532: ......