4 Repair
4.3.4. Replacement of cable harness, axes 5-6, IRB 6600ID and IRB 6650ID
3HAC023082-001 Revision: E
254
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Removal, cable harness axes 5-6
The procedure below details how to remove the cable harness from the upper arm.
Standard toolkit
The contents are defined in
section
, in part 2 of the
Product manual.
Product manual -
SpotPack/DressPack
OrangeLine
Art. no. is specified in
section
Equipment
Spare part no.
Art. no.
Note
Action
Note/Illustration
1. Run the robot to its calibration position.
Shown in section
correct axis position on page 412
2.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off
the air pressure to motors and SMB.
3. Remove the process cabling from the
upper arm, if any.
How to remove the DressPack harness
from the upper arm / wrist unit, is detailed
in the
Product manual - SpotPack/
DressPack OrangeLine
.
4. Remove the
cover
from the upper arm tube
and the
hood
from the upper arm housing.
5. Disconnect all the connectors at the axis 5
and 6 motors, and the connector at the
cable harness division point.
The connectors are specified and shown
in the figure
.
6. Remove the two cable clamps (A) from the
bracket at the back of the upper arm
housing.
xx0500001903
Continued
Continues on next page
Summary of Contents for IRB 6600 - 175/2.8 type B
Page 2: ......
Page 10: ...Table of Contents 8 3HAC023082 001 Revision E Copyright 2004 2008 ABB All rights reserved ...
Page 532: ......