4 Repair
4.7.4. Replacement of gearbox, axis 6
3HAC023082-001 Revision: E
408
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
6. If the robot is going to work in a water jet
application cell:
•
apply Mercasol on unpainted
surfaces between gea box and
turning disk
•
apply Mercasol on the screw heads
in the front of the turning disk.
xx0600003143
7. Perform a leak-down test.
Detailed in section
.
8. Refill the gearbox with oil.
Detailed in section
9. Recalibrate the robot.
Calibration is detailed in a separate
calibration manual, enclosed with the
calibration tools.
General calibration information is included
in section
Calibration information on page
10.
DANGER!
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in section
First test run may cause injury or damage!
on page 38
.
Action
Note/Illustration
Continued
Summary of Contents for IRB 6600 - 175/2.8 type B
Page 2: ......
Page 10: ...Table of Contents 8 3HAC023082 001 Revision E Copyright 2004 2008 ABB All rights reserved ...
Page 532: ......