3 Maintenance
3.3.7. Inspection, cable harness
3HAC027151-001 Revision: B
110
©
Co
py
rig
h
t 200
6-
200
8 ABB. All righ
ts reser
v
ed.
Inspection cable harness, axes 1-6
The procedure below details how to inspect the cable harness of axes 1-6.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
2. Make an overall inspection of the cable
harness, in order to detect wear and damage.
3. Check the
connectors at the base
.
Shown in the figure
4. Check the cables.
Shown in the figure
5. Check the
metal clamps
on the robot.
Shown in the figure
6. Replace the cable harness if wear or damage
is detected!
Detailed in section:
Replacement of cable harness, lower
end (axes 1-2) on page 153
Replacement of cable harness, upper
end on page 159
Continued