H
hanging
installed hanging, 24
hazardous material, 335
height
installed at a height, 24
hold-to-run, 29
HRA, 18
humidity
I
information labels location, 137
inspecting
additional mechanical stop, 141
cable harness, 134
information labels, 137
mechanical stop, 139
inspecting oil levels
axis-6, 131
axis-5, 129
axis-4, 127
axis-3, 125
axis-2, 122
axis-1, 120
installation
mechanical stop axis 1, 107
mechanical stop axis 3, 109
installing equipment on robot, 96
instructions for assembly, 47
integrator responsibility, 17
intervals for maintenance, 117
L
labels
robot, 41
leak-down test, 178
Levelmeter calibration, 307
lifting accessory, 345
lifting robot
with fork lift, 69
with roundslings, 77
limitation of liability, 17
Lithium
disposal, 335
loads on foundation, 58
lower arm
dimensions, 96
lubrication
amount in gearboxes, 149
type of lubrication, 149
M
magnesium
disposal, 335
maintenance schedule, 117
manually releasing brakes, 79
mechanical stop
mechanical stop location, 139
motor axis 1, replacement, 242
motor axis 2, replacement, 247
motor axis 3, replacement, 253
motor axis 4, replacement, 260
motor axis 5, replacement, 265
motor axis 6, replacement, 270
MoveAbsJ instruction, 334
N
nation specific regulations, 17
negative directions, axes, 312
neodymium
disposal, 335
NiCad
disposal, 335
nodular iron
disposal, 335
O
oil
amount in gearboxes, 149
disposal, 335
type of oil, 149
oil change
oil level
gearbox axis-6, 131
gearbox axis-5, 129
gearbox axis-4, 127
gearbox axis-3, 125
gearbox axis-2, 122
gearbox axis-1, 120
operating conditions, 60
P
pedestal
installed on pedestal, 24
plastic
disposal, 335
positive directions, axes, 312
product standards, 339
protection classes, 60
protection type, 60
protective equipment, 25
protective wear, 25
R
region specific regulations, 17
release brakes, 22
replacement
brake release board, 238
complete arm system, 202
gearbox axis 6, 299
motor axis 1, 242
motor axis 2, 247
motor axis 3, 253
motor axis 4, 260
motor axis 5, 265
motor axis 6, 270
turning disk, 213
replacing
SMB battery, 169
requirements on foundation, 59
responsibility and validity, 17
restricting
working range axis 1, 107
working range axis 3, 109
revolution counters
storing on FlexPendant, 316
updating, 313
risk of tipping, 65
356
Product manual - IRB 6620
3HAC027151-001 Revision: T
© Copyright 2006-2018 ABB. All rights reserved.
Index
Summary of Contents for IRB 6620
Page 1: ...ROBOTICS Product manual IRB 6620 ...
Page 8: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 350: ...This page is intentionally left blank ...
Page 352: ...This page is intentionally left blank ...
Page 358: ......
Page 359: ......