4 Repair
4.6.8. Replacement of motor, axis 6, IRB 6640ID
3HAC026876-001 Revision: F
360
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
Refitting, motor axis 6
The procedure below details how to refit the motor, axis 6.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2. Make sure the o-ring on the circumference of
the motor is seated properly. Ligthly lubricate
with grease.
The article numbers are specified in
Required equipment on page 358
.
3. In order to release the brakes, connect the 24
VDC power supply to the motor.
Connect to connector R3.MP6:
•
+ : pin C
•
- : pin D
4. Fit the motor, making sure the motor pinion is
properly mated into the gear of axis 6.
5. Secure the motor with its three attachment
screws and washers.
3 pcs, M8x25. Tightening torque: 24
Nm.
Dimensions of the tools are specified
in the figure
.
6. Disconnect the brake release voltage.
7. Reconnect the motor connectors.
.
8. Perform a leak-down test.
9. Refill the axis 6 gearbox with oil, if previously
drained.
.
10. Recalibrate the robot.
Calibration is detailed in a separate
calibration manual enclosed with the
calibration tools.
General calibration information is
included in the section
Calibration
information
.
11.
DANGER!
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in the section
may cause injury or damage! on page 41
Continued