3 Maintenance
3.3.8. Inspection, cable harness
137
3HAC020993-001 Revision: G
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Location of cabling axes 5-6
The robot cable harness, axes 5-6, is located as shown in the figure below.
Note!
The cable harness is also available without the division point R2.M5/6. Except for the
connectors at the division point, the rest of the inspection points are the same for the harness
that runs undivided from axis 1 to axis 6.
xx0200000234
Inspection, cable harness, axes 5-6
The procedure below details how to inspect the cable harness of axes 5-6.
A
Connectors at cable harness division point, R2.M5/6
B
Cable attachment, rear of upper arm
C
Cable attachment, upper arm tube
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the
air pressure to motors and SMB.
Continued
Continues on next page