2 Installation and commissioning
2.3.10. Installation of cooling fan for motors, axes 1-3 (option)
3HAC020993-001 Revision: G
82
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Installation, separate fan cabling axis 1 or 2
The procedure below details how to install the separate cabling for the cooling fan of axis 1
or 2.
Action
Note/Illustration
1. Move the robot to its calibration position.
Shown in section
scales and correct axis position on
page 368
2.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
3. Remove the
rear cover plate
from the robot base. Shown in the figure
4. Fit the
plate for customer connections
, if not
already fitted, to the connection plate of the robot
base.
Shown in the figure
customer connections, at base on
page 80
.
Art. no. is specified in
5. Run the cabling through the base and frame, up
beneath the balancing device.
6. Secure the
cable bracket
to the bracket of the
robot cabling inside the frame.
Run the cable underneath the robot cabling and
out through the side of the frame, at motor, axis 1.
The correct cable run is shown in the figure to the
right!
Note!
There is a risk of the balancing device
damaging the cable if it is not protected by the
robot cabling!
xx0500002174
A. Cable bracket. Also shown
cabling for axis 1 or 2 on
page 81
Continued
Continues on next page