2 Installation and commissioning
2.3.3. Lifting robot with lifting slings
55
3HAC028197-001 Revision: A
©
Co
py
rig
h
t 200
7-
200
8 ABB. All righ
ts reser
v
ed.
3.
NOTE!
If the robot is equipped with forklift pockets, it
is necessary to remove these in order to reach
the lower holes in the frame. These are used
to attach the
hooks
of the lifting slings.
Shown in the figure
.
4. Fit the
lifting device, robot
to the robot as
described in the enclosed instruction!
.
5.
CAUTION!
The robot models weigh:
•
IRB6660-130/3.1: 1910 kg
•
IRB6660-205/1.9: 1730 kg
All lifting equipment used must be sized
accordingly!
6.
WARNING!
Personnel must not, under any circum-
stances, be present under the suspended
load!
7. Raise the overhead crane to lift the robot.
Make sure all hooks and attachments
maintain their correct positions while
lifting the robot!
Always move the robot at very low
speeds, making sure it does not tip.
Action
Note
Continued
Summary of Contents for IRB 6660 - 130/3.1
Page 1: ...Product manual Articulated robot IRB 6660 130 3 1 IRB 6660 205 1 9 M2004 ...
Page 2: ......
Page 332: ... 0 1 23 3 4 5 5 6 2 70 2 888 2 9 6 0 9 9 2 A 8B C D 9 8 B ...
Page 333: ... 2 3 4 5 5 6 2 70 2 888 2 9 6 0 9 9 1 EF 2 888 2 9 6 9 9 8 B ...
Page 336: ... 98 2 888 7 066 0 10I 4 5 5 06 6 2 70 2 888 2 9 6 0 9 9 G E 7 F E 7 F 9 8 B ...
Page 347: ......