Check for leakage
The front ear of the balancing device is lubricated with grease.
Leaks at o-rings, radial sealings etc. are not acceptable and must be attended to
immediately to avoid damage to the bearing.
xx1000000207
Shaft
A
Radial sealing with dust lip, 50x68x8 (2 pcs)
B
O-ring, 85x3
C
End cover
D
Note
Action
Clean the area at the front ear from contamina-
tion.
1
Run the robot for some minutes, in order to
move the balancing device piston.
2
DANGER
Turn off all:
•
electric power supply to the robot
•
hydraulic pressure supply to the robot
•
air pressure supply to the robot
Before entering the robot working area.
3
Check the area around the o-ring and radial
sealings at the front ear, for leakage.
4
The o-ring and radial sealings are in-
cluded in the Maintenance kit, bear-
ings and seals already assembled with
sealing spacers and sealing rings.
Article number for the kit is specified
in
Replace o-ring and radial sealings if leaks are
detected.
5
Replacement of the complete bearing
is described in section
Continues on next page
138
Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
3 Maintenance
3.3.8 Inspecting the balancing device
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......