Preparations before removing the upper arm - IRB 6700 - 200/2.60, IRB 6700 - 155/2.85
Note
Action
Guide pin, M12x150: 3HAC13056-2
Remove two attachment screws in opposite
holes and replace them with guide pins.
Note
Make sure that it is the screws that hold
the lower arm to the axis-3 gearbox that
are removed!
1
Guide pin, M12x200: 3HAC13056-4
Always use guide pins in pairs.
xx1300002245
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
xx1300002246
Leave one of the remaining attachment
screws fitted, remove the other screws.
2
Preparations before removing the upper arm - IRB 6700 - 300/2.70, IRB 6700 - 245/3.00
Note
Action
Guide pin, M16x150: 3HAC13120-2
Remove two attachment screws in opposite
holes and replace them with guide pins.
Note
Make sure that it is the screws that hold
the lower arm to the axis-3 gearbox that
are removed!
1
Guide pin, M16x200: 3HAC13120-3
Always use guide pins in pairs.
xx1400002563
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
Continues on next page
Product manual - IRB 6700
315
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.5.1 Replacing the upper arm
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......