Note
Action
Remove the lifting accessory from the
lower arm.
8
Preparations before refitting the upper arm
Note
Action
Wipe clean all contact surfaces.
1
Rust preventive: 3HAC034903-001 (Mer-
casol 3110 Waxcoat. Recommended drying
time is 24h.)
xx1700001880
Foundry Plus
:
Apply Mercasol on the surface on the lower
arm as shown in the figure.
CAUTION
Keep the sealing surfaces clean from Mer-
casol.
2
Guide pin, M12x150: 3HAC13056-2
IRB 6700 - 235/2.65, IRB 6700 - 205/2.80,
IRB 6700 - 175/3.05, IRB 6700 - 150/3.20
3
Guide pin, M12x200: 3HAC13056-4
Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
Always use guide pins in pairs.
xx1700000058
Continues on next page
Product manual - IRB 6700
413
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.5.5 Replacing the lower arm
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......