Note
Action
This is done to achieve the best stability
of the complete arm system, when it is
resting by itself, after it has been re-
moved.
Remove tools and other equipment fitted on
the turning disc.
DressPack can stay fitted for the time being.
4
xx1400002179
Hold the mechanical stop pin in a firm grip,
and remove it by unscrewing the attachment
screw.
CAUTION
The mechanical stop weighs 5 kg.
5
See
Draining the axis-1 gearbox on
.
Begin draining the axis-1 gearbox.
6
xx1400002169
Loosen 14 of the 18 attachment screws as
far as it is possible at this point.
The four screws that are left in place, diagon-
ally located to each other, work as an anvil
for the axis 1 rotation when unscrewing the
hub later on.
7
Note
It will not be possible to remove the
screws completely at this point.
xx1400000722
Foundry Plus.
Cut the cable tie that hold the axis-1 and axis-
2 motor cables on the protection plates.
8
Continues on next page
630
Product manual - IRB 6700
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox (IRB 6700 - 300/2.70, IRB 6700 - 245/3.00)
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......