Note
Action
Grease: 3HAA1001-294
xx1300000783
Unscrew both screws in link ear and fill the bear-
ing with grease from the upper hole until the
grease appears in the lower hole.
14
Refit the two screws and wipe clean from residual
grease.
15
Concluded refitting of the front shaft
Note
Action
Remove the lifting accessory from the bal-
ancing device.
1
xx1200001283
Refit the cable bracket (if not already refit-
ted).
2
DANGER
Do not use the Distance tool: 3HAC030662-
001 to unload or restore the pressure of
the balancing device spring unit! This tool
is only used to lock the spring unit in a
compressed position, after axis-2 has been
jogged to -20° or +20°. Fitting and removal
of the tool shall only be done with axis-2 in
this position!
To unload or restore a new balancing
device or if the spring unit of the balancing
device cannot be compressed by jogging
the robot, only use the hydraulic press tool
Dismantle and mounting tool 3HAC028920-
001.
3
This is done in order to compress the
spring unit inside the balancing device be-
fore refitting or removal of the distance tool.
Jog axis-2 to:
•
-30° or +30°.
4
Continues on next page
Product manual - IRB 6700
735
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-2 gearbox (IRB 6700 - 300/2.70, IRB 6700 - 245/3.00)
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......