Note
Action
Screws:
•
M8x40 quality 12.9 Gleitmo, 16 pcs
(IRB 6700 -235/2.65, -205/2.80,
-175/3.05, -150/3.20)
•
M6x30 quality 12.9 Gleitmo, 24 pcs
(IRB 6700 -200/2.60, -155/2.85)
•
M8x50 quality 12.9 Gleitmo, 16 pcs
(IRB 6700 -300/2.70, -245/3.00)
Tightening torque:
Secure the gearbox with its attachment
screws.
3
35 Nm (IRB 6700 -235/2.65, -205/2.80,
-175/3.05, -150/3.20, -300/2.70, -245/3.00)
14 Nm (IRB 6700 -200/2.60, -155/2.85)
xx1700001600
See
Performing a leak-down test on
Perform a leak-down test.
4
Jog axis-5 to horizontal position.
5
See
Filling oil into the axis-6 gearbox on
Refill oil in the gearbox.
6
Refitting the turning disc
Note
Action
See
Replacing the synchronization mark
.
If new turning disc spare part is installed:
verify that the correct synchronization mark
plate for axis-6 is installed on the wrist.
1
Wipe clean the contact surfaces.
2
A
B
xx1400000385
Foundry Plus
:
Apply Mercasol on the surfaces on turning
disc and axis-6 gearbox as shown in the
figure.
3
Continues on next page
Product manual - IRB 6700
783
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.6 Replacing the axis-6 gearbox
Continued
Summary of Contents for IRB 6700 Series
Page 1: ...ROBOTICS Product manual IRB 6700 ...
Page 46: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 786: ...This page is intentionally left blank ...
Page 812: ...This page is intentionally left blank ...
Page 836: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 845: ......