Preparations with the power turned off
Note
Action
DANGER
Make sure that all supplies for electrical
power, hydraulic pressure, and air pressure
are turned off.
1
See section
•
Replacing the cable harness, upper
end (incl. axis 6) on page 163
Remove the
cable harness
in the upper arm.
2
See section
•
Replacing linkage - upper link arm
on page 228
•
Replacing the linkage - lower link
arm on page 235
•
Replacement of linkage - link on
page 242
Remove the
linkage system
.
3
See section
•
Replacing the tilthouse unit on
page 191
Remove the
tilthouse unit
.
4
Run an overhead crane to a position above
the robot.
5
xx1100000088
Secure the
upper arm
in the crane with
roundslings
.
6
Raise the lifting accessories to take the
weight of the upper arm.
7
See section
•
Replacing the parallel rod on
page 253
Remove the
parallel rod
.
8
Removing the shafts
Note
Action
Before continuing, make sure that the upper
arm is secured in the lifting accessories and
overhead crane.
1
Continues on next page
Product manual - IRB 760
215
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.3 Replacing the upper arm
Continued
Summary of Contents for IRB 760 Series
Page 1: ...ROBOTICS Product manual IRB 760 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 144: ...This page is intentionally left blank ...
Page 394: ...This page is intentionally left blank ...
Page 400: ......
Page 401: ......