4.4.4 Replacing linkage - upper link arm
Overview
The linkage consists of three basic parts -
upper link arm
,
lower link arm
and
link
.
This procedure describes how to remove and refit the upper link arm.
How to replace lower link arm and link see:
•
Replacing the linkage - lower link arm on page 235
•
Replacement of linkage - link on page 242
Location of upper link arm
The upper link arm is located as shown in the figure.
xx1000001083
Upper link arm
A
Link
B
Lower link arm
C
Continues on next page
228
Product manual - IRB 760
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.4 Replacing linkage - upper link arm
Summary of Contents for IRB 760 Series
Page 1: ...ROBOTICS Product manual IRB 760 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 144: ...This page is intentionally left blank ...
Page 394: ...This page is intentionally left blank ...
Page 400: ......
Page 401: ......