Note
Action
xx1000001252
If the upper link arm is removed, secure the
link with a roundsling in a crane. Use the
hole in the middle of the link.
2
This is done in order to prevent the link
from moving if both the upper link arm
and lower link arm are removed.
xx1000001251
Remove the
lock nuts
and
support washers
that hold the lower link arm at each end.
Note
The support washers can stick to the grease
and can easily be forgotten and lost when
removing the lock nuts.
3
CAUTION
The link weighs 23 kg.
All lifting accessories used must be sized
accordingly!
4
Continues on next page
Product manual - IRB 760
237
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.5 Replacing the linkage - lower link arm
Continued
Summary of Contents for IRB 760 Series
Page 1: ...ROBOTICS Product manual IRB 760 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 144: ...This page is intentionally left blank ...
Page 394: ...This page is intentionally left blank ...
Page 400: ......
Page 401: ......