Note
Action
Attachment screws: M6x30 12.9.
Remove the hub tool and fit the attachment
screws for the hub.
4
Loctite 243
Apply locking liquid (Loctite 243) on the
screws.
Note
The number of attachment screws differ
depending on gearbox.
Quantity:
•
Axis-1 = 6 pcs
•
Axis-2 = 8 pcs
•
Axis-3 = 8 pcs
•
Axis-4 = 4 pcs
•
Axis-5 = 6 pcs
•
Axis-6 = 4 pcs
Tightening torque: 14 Nm.
Secure the hub.
5
Performing a leak-down test
Note
Action
See
Performing a leak-down test on
Perform a leak-down test.
1
Preparations before refitting the motor
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
2
Wipe clean the contact surfaces from any remain-
ing contamination.
3
Also wipe clean the o-ring groove.
O-ring, 3HAB3772-107
xx1200001019
Inspect the o-ring.
Note
Replace if damaged.
4
Continues on next page
Product manual - IRB 8700
607
3HAC052853-001 Revision: M
© Copyright 2015-2020 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-2 gearbox
Continued
Summary of Contents for IRB 8700
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 8: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 718: ...This page is intentionally left blank ...
Page 724: ...This page is intentionally left blank ...
Page 742: ...This page is intentionally left blank ...
Page 748: ......
Page 749: ......