Refitting the axis-4 gear Z3 - Step 2
Note
Action
Attachment screws: M16x50 12.9 Gleitmo
603 (9 pcs)
When the play is measured and approved,
fit the remaining attachment screws.
1
Attachment screws: M12x40 12.9 Gleitmo
603 (27 pcs)
Tightening torque: 300 Nm
Secure the M16 screws.
2
Tightening torque: 120 Nm
Secure the M12 screws.
3
Inspect the gasket on the arm house cover.
Note
Replace if damaged.
4
Loctite 574
Apply flange sealant (Loctite 574) on the
cover flange.
5
Attachment screws: M6x16 (22 pcs)
Attach the arm house cover and tighten all
screws alternately and repeat once.
6
Tightening torque: 10 Nm
Apply locking liquid (Loctite 243) on the
screws.
See
Performing a leak-down test on
Perform a leak-down test.
7
Continues on next page
Product manual - IRB 8700
675
3HAC052853-001 Revision: M
© Copyright 2015-2020 ABB. All rights reserved.
4 Repair
4.8.5 Replacing the axis-4 primary gearbox
Continued
Summary of Contents for IRB 8700
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 8: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 690: ...This page is intentionally left blank ...
Page 718: ...This page is intentionally left blank ...
Page 724: ...This page is intentionally left blank ...
Page 742: ...This page is intentionally left blank ...
Page 748: ......
Page 749: ......