Removing the axis-1 gear unit sub-assembly
Use these procedures to remove the axis-1 gear unit sub-assembly.
Preparations before removing the axis-1 gear unit sub-assembly
Note
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
If there is no enough space for the maintenance
work, remove the robot from the wall and place it
on the maintenance bracket.
CAUTION
Do not lay down the robot during the transporta-
tion, always keep it straight.
If the robot lay down in any situation, the grease
may come out from gearbox.
2
xx2100000930
Jog all axes to zero position.
3
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the safeguarded
space.
4
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
5
Continues on next page
Product manual - IRB 920
845
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.1 Replacing the axis-1 gear unit sub-assembly
Continued
Summary of Contents for IRB 920
Page 1: ...ROBOTICS Product manual IRB 920 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 984: ...This page is intentionally left blank ...
Page 1000: ...This page is intentionally left blank ...
Page 1002: ...This page is intentionally left blank ...
Page 1006: ......
Page 1007: ......