Note
Action
xx2300000497
Remove the screws on the bracket.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
3
Removing the axis-3 motor sub-assembly
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
DANGER
Make sure that the ball screw is supported with
something.
The sudden drop of the ball screw due the lost of
the axis-3 motor may cause danger.
2
xx2300000594
Remove the screws.
3
Remove the axis-3 motor sub-assembly.
4
Releasing the ball screw with the flange
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
330
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-3 timing belt
Continued
Summary of Contents for IRB 930
Page 1: ...ROBOTICS Product manual IRB 930 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 600: ...This page is intentionally left blank ...
Page 604: ......
Page 605: ......