2.3.3 Unpacking
Inspection
The track motion IRBT 2005 has been pre-assembled in ABB factory. For delivery
and storage's convenience, it would be divided into several segments as an unit
depending on the length of the track when delivered.
The track IRBT 2005 is wrapped in plastic. Unpack the track and inspect for any
visible transport damage. If the track motion is damaged, contact ABB.
Contents
As standard, the track motion IRBT 2005 includes the following on delivery:
•
Track motion IRBT 2005 segments depending on the length
Cleaning
Before transport, the track motion IRBT 2005 has been protected against rust by
a thin film of oil that has been applied before packing.
Note
Do not clean any of the pre-lubricated linear guide and rack.
Illustration/Note
Action
Wipe off any surplus oil using a lint-free
cloth.
1
Product manual - IRBT 2005
51
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
2 Installation and commissioning
2.3.3 Unpacking
Summary of Contents for IRBT 2005
Page 1: ...ROBOTICS Product manual IRBT 2005 ...
Page 8: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 148: ...This page is intentionally left blank ...
Page 284: ...This page is intentionally left blank ...
Page 286: ...This page is intentionally left blank ...
Page 289: ......