Required equipment
Note
Art. No.
Equipment
Cables must be designed for use in
continuous flexing operation.
Spare part number is
specified in
Cables
Spare part number is
specified in
Cable chain parts
Use heavy duty cable ties with minim-
um width: 4.9 mm.
21662055-3
Cable ties
Content is defined in section
.
-
Standard toolkit
These procedures include references
to the tools required.
Other tools and proced-
ures may be required.
See references to these
procedures in the step-
by-step instructions be-
low.
See
-
Circuit diagram
Moving away the carriage
Illustration/Note
Action
Remove all cover plates.
1
Move the carriage so that the drive train and the
grease distribution block is away from the fixed
end of the cable chain.
2
WARNING
Turn off all electric power and pneumatic pressure
supplies to the robot and for the track motion.
3
Remove the brake release unit and cut the straps
that hold the brake release cables to the carriage.
4
Remove the bracket at the cable outlet.
5
Loosen the carriage from the drive train bracket
by removing the screws.
6
Move away the carriage to access the movable
end of the cable chain.
CAUTION
Be careful not to damage the brake release
cables.
7
Removing the cable
Illustration/Note
Action
Disconnect the motor cables and cut the cable
straps.
1
Continues on next page
254
Product manual - IRBT 2005
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
4 Repair
4.9.3 Replacing the cables
Continued
Summary of Contents for IRBT 2005
Page 1: ...ROBOTICS Product manual IRBT 2005 ...
Page 8: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 148: ...This page is intentionally left blank ...
Page 284: ...This page is intentionally left blank ...
Page 286: ...This page is intentionally left blank ...
Page 289: ......