2.4.5 Assembling the sections of the track motion IRBT 2005 (Longer than 9 m)
Required equipment
Standard tools
Tool
Quantity
Ring-open-end spanner 8 - 22 mm
1
Small flat tip screwdriver
1
Torque wrench 10 -140 Nm
1
Ratchet head for torque wrench 1/2"
1
Special tools
Illustration
Art. No.
Description
Quantity
-
Rack clamps
2
3HAC054535-001
Leveling tool
1
3HAC054534-001
Locking nut adjust-
ment tool
1
Continues on next page
Product manual - IRBT 2005
83
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
2 Installation and commissioning
2.4.5 Assembling the sections of the track motion IRBT 2005 (Longer than 9 m)
Summary of Contents for IRBT 2005
Page 1: ...ROBOTICS Product manual IRBT 2005 ...
Page 8: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 148: ...This page is intentionally left blank ...
Page 284: ...This page is intentionally left blank ...
Page 286: ...This page is intentionally left blank ...
Page 289: ......