Note
Action
Tip
To make sure that all screws in this area are
torqued, use a marker pen and mark each screw
after it has been torqued.
3
Examine that all screws in this area now has been
torqued.
4
Concluding procedure
Note
Action
See
Performing a leak-down test on
Perform a leak-down test (if not already
done).
1
See
Changing oil in axis-2 and axis-3
.
Refill the gearbox with oil.
2
Axis Calibration is described in
with Axis Calibration method on page 805
Recalibrate the robot.
3
General calibration information is included
in section
.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on
page 27
.
4
Product manual - IRB 8700
759
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued
Summary of Contents for IRC5 Compact
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 16: ...This page is intentionally left blank ...
Page 824: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 840: ...This page is intentionally left blank ...
Page 846: ......
Page 847: ......