3 Maintenance
3.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRB
8700.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
Note
If the IRB 8700 is connected to power, always make sure that the IRB 8700 is
connected to protective earth before starting any maintenance work.
For more information see:
•
Product manual - IRC5
Product manual - IRB 8700
99
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
3 Maintenance
3.1 Introduction
Summary of Contents for IRC5 Compact
Page 1: ...ROBOTICS Product manual IRB 8700 ...
Page 16: ...This page is intentionally left blank ...
Page 824: ...This page is intentionally left blank ...
Page 838: ...This page is intentionally left blank ...
Page 840: ...This page is intentionally left blank ...
Page 846: ......
Page 847: ......