Note/Illustration
Action
Release the carriage brake and push the carriage
manually to check the rails alignment: if the rails
are correctly aligned, you should sense no “step”
while passing the rails junction. If so then push
downward the rail against the side member
shoulder and verify the 0.2 mm gap between rails.
Tip
For more information on moving carriage manu-
ally, see
Moving the carriage manually on page 117
16
Tightening torque: 128 Nm ±3%
When the alignment is correct, tighten the rail
screws one by one, after applying Loctite 243 on
their thread.
17
Use a brush to lubricate the rails.
18
xx2200000834
Secure the rack by slightly tighten the locking
screws
Note
Check that the
chamfer is located in front of the
side member step
(check on preassembled sec-
tion if you are not sure).
19
xx2200001170
xx2200001171
Continues on next page
Product manual - IRT 710
125
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.4.7.1 Assembling the sections
Continued
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......