Note
Action
Release the carriage brake and push the
carriage manually to check the rails align-
ment.
6
If the rails are correctly aligned, you should
sense no “step” while passing the rails
junction. If so then push downward the rail
against the side member shoulder and
verify the 0.02 mm gap between rails.
Tip
For more information on moving carriage
manually, see
Tightening torque: 128 Nm ±3%
When the alignment is correct, tighten the
rail screws one by one, after applying Loc-
tite 243 on their thread.
7
Use Shell Gadus S2 V220 00.
WARNING
The grease used causes serious eye irrita-
tion and may cause an allergic skin reac-
tion.
Lubricate the rails.
8
Concluding procedure
Note
Action
DANGER
Make sure all safety requirements are met when
performing the first test run. See
may cause injury or damage on page 29
1
270
Product manual - IRT 710
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the rectangular rails
Continued
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......