Note
Action
xx2200000885
Refit the movable chain end to the bracket and
secure with screws.
2
Refit the movable chain end with bracket to the
cable chain.
Note
Be careful with the cables routing.
3
Screws: ISO 4762 M6x20 Class 8.8
(4 pcs)
Washers: BN 792 M6 Washer (4
pcs)
Tightening torque: 10 Nm
Replacing the inner cable chain link
on page 295
Refit the cable chain link besides the movable
chain end.
4
Replacing the outer cable chain
link on page 288
Refit the plastic link bars.
5
xx2200000882
Refit the movable chain end bracket with cables
to the carriage and secure with screws.
6
Screws: ISO 4762 M12x35 Class
8.8 (2 pcs)
Washers: BN 792 M12 Washer (2
pcs)
Tightening torque: 83 Nm
Pull the cables out and route the cable in the
movable chain end.
7
Fix the cables with straps on the cable chain ac-
cording to the photo taken before the replacement.
8
Continues on next page
Product manual - IRT 710
331
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.4.2.6 Replacing the cables in cable chain
Continued
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......