3.5.11 Inspection points of cable chain prior to start-up
Important inspection points prior to start-up of track
Please use the inspection sheet below to check that the installation of the cable
chain is complete, before the track is commissioned.
Inspection sheet
Cable inspection
No
Yes
Inspection
All cables in the radius can be moved lengthways?
Cable clearance in both end positions of the travel distance
checked?
Cable clearance in end positions after approximately 4 weeks of
operation checked?
Strain relief present at moving end?
Strain relief present at fixed end?
Cable chain inspection
No
Yes
Inspection
All covers closed?
Internal separators in place?
Moving end aligned with guide channel?
Chain brackets tightened and secured using Nylock nuts on the
moving end and Loctite on the fixed?
Support and strapping plate on carriage correctly arranged and
tight?
Cable tray inspection
No
Yes
Inspection
Cable tray free of foreign objects?
Tray internal width > 2 mm and < 4 mm than chain outside width?
Transition of glide rail to chain lower run at same height?
Tray joints arranged flush and unobstructed?
Cable tray running parallel to the moving end guide?
Glide bars don’t move. Screw holding glide bars at least one
every two meters?
Product manual - IRT 710
171
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.5.11 Inspection points of cable chain prior to start-up
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......