4 Maintenance
4.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRT
710.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any service
work.
The maintenance must be done by qualified personnel in accordance with the
safety requirements set forth in the applicable national and regional standards and
regulations.
Note
If the IRT 710 is connected to power, always make sure that the IRT 710 is
connected to protective earth and a residual current device (RCD) before starting
any maintenance work.
For more information see:
•
Product manual - IRC5
•
.
Product manual - IRT 710
179
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
4 Maintenance
4.1 Introduction
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......