12
I SO T X FOR POWE RVA LU E RT G 2 U L 5 -10 K VA
STATUS:
Approved
SECURITY LEVEL:
Public
DOCUMENT ID:
4NWD005663
REV:
A
LANG:
EN
PAGE:
12 / 18
© Copyright 2022 ABB. All rights reserved.
—
4 4 3 Electrical installation:
Step 1: Prepare cables according to chapter 5.
Step 2: Remove the terminal cover from unit.
—
4.4.3-1
Step 3: Remove the knock-out hole of terminal cover, fix the Cable gland in it.
—
4.4.3-2
Step 4: Fix wires on terminal block as needed (terminal wiring details in the following
paragraphs), through the cable gland, and assemble the terminal cover back on unit.
—
4.4.3-3
—
4.4.3-1
Step 2
—
4.4.3-2
Step 3
—
4.4.3-3
Step 4
Summary of Contents for ISO TX 6k
Page 17: ......