10
User Guide
| OI-LLT100-EN Rev. D
LLT100
Laser level transmitter
3.5 Powering on the instrument
Once the LLT100 has been connected, you energize it by
turning on the power source.
Before turning on the power source, check the following:
– Covers’ installation
– Locking screws tightness
– Process connections
– Electrical connections
The LLT100 can then be put into operation.
NOTICE
Brief interruptions in power supply will result in
initialization of the electronics (the embedded software
restarts).
3.5.1 Typical connections
Figure 6
2 + 2 wires
Figure 7
2 + 2 wires (with heater option)
Figure 8
2 wires
Summary of Contents for LLT100
Page 8: ...This page intentionally left blank ...
Page 10: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 22: ...This page intentionally left blank ...
Page 26: ...This page intentionally left blank ...
Page 44: ...This page intentionally left blank ...
Page 50: ...This page intentionally left blank ...
Page 66: ...This page intentionally left blank ...
Page 67: ......