9. Location of crash and turnover protection (shockwatch label and tilt watch)
10. PE foil UV resistant shall be utilised on the top of the packing
Figure 5-09 Seaworthy packing procedure, steps 9 & 10
The switchgear shall be wrapped with foil after upholstering sharp edges and corners. The joints of the foil shall be sealed.
A protective drying agent according DIN 55474 shall be utilised between the foil and the switchgear. No direct contact of this
protective drying agent with the switchgear is allowed.
!
Only remove the packaging after delivery of the switchgear to site.
Only remove the transport frames from the section bases at the place of erection.
Summary of Contents for MNS-Up
Page 6: ... 01 Introduction ...
Page 8: ... 02 Safety first ...
Page 12: ... 03 General technical data ...
Page 16: ... 04 System description ...
Page 18: ... 05 Packing storage and transportation ...
Page 36: ... 06 Transport ...
Page 40: ... 07 Erecting ...
Page 47: ...47 ERECTING ...
Page 48: ... 08 MNS Up configuration ...
Page 52: ... 09 MNS Up Module installation ...
Page 55: ...55 MNS UP MODULE INSTALL ATION ...
Page 56: ... 10 Handling of EMC boards ...
Page 59: ...59 HANDLING OF EMC BOARDS ...
Page 60: ... 11 Communication boards ...
Page 62: ... 12 MNS 3 0 sections ...
Page 64: ... 13 Commissioning ...
Page 66: ... 14 Operating of MNS Up system ...
Page 68: ... 15 Tightening torques for screw connection in MNS Up ...
Page 72: ... 16 Spare parts ...
Page 74: ... 17 Onsite inspection and maintenance ...
Page 76: ... 18 Maintenance intervals ...
Page 81: ...81 MAINTENANCE INTERVALS ...
Page 83: ......